Lowell Floorplans - Sixth Draft - Drawn June 23, 2004

Changes from 5th draft:

  1. Rearranged the basement bathroom to move the plumbing to the other wall.

First Floor


Click to enlarge


Second Floor


Click to enlarge


Basement


Click to enlarge


Front Elevation


Click to enlarge


Back & Side Elevations


Click to enlarge


Last modified on July 9, 2004
This page maintained by Jim Lowell - jlowell@visi.com