Lowell Floorplans - Third Draft - Drawn May 13, 2004
Changes from 2nd draft:
- Added service door to back of garage
- Straightened out the wall left of the breakfast nook, making the kitchen & basement larger
- Straightened out the wall on the bottom of the mudroom, making the closet larger
- Vaulted the ceiling in the master bathroom and master closets
- Added 2 rows of glass block to the master bathroom wall over the shower
- Changed the upstairs closet doors from 2 x 2' doors to a single 3' door
- Knocked the corner off of the coat closet on the main floor
- Added second gable over garage
First Floor

Click to enlarge
Second Floor

Click to enlarge
Basement

Click to enlarge
Front Elevation

Click to enlarge
Back & Side Elevations

Click to enlarge
Last modified on May 14, 2004
This page maintained by Jim Lowell - jlowell@visi.com